
The Ács factory project involves the construction of a state-of-the-art industrial facility with two production halls, designed to reach an annual capacity of 100,000 tons of cathode material. Production will start with 50,000 tons in the first phase and gradually expand to full capacity. Building electrical systems play a key role in the project: the fully automated and closed production process requires advanced power supply, reliable control systems, and modern safety solutions. The design therefore integrates a complex electrical infrastructure capable of supporting the continuous and dependable operation of cutting-edge industrial technologies, ensuring long-term efficiency and operational reliability for the plant.